EVs, HEVs, PHEVs are exempted from EDSA odd-even scheme

EVs, HEVs, PHEVs are exempted from EDSA odd-even scheme
Electrified vehicles can pass through EDSA during rehabilitation works
Earlier today, the Department of Transportation (DOTr) and the Metropolitan Manila Development Authority (MMDA) announced that the EDSA rehabilitation project (now called EDSA Rebuild) will see the implementation of an odd-even scheme.
While the major thoroughfare won't be totally closed to motorists, it will be constricted due to the duration and scale of the rehabilitation, which is expected to last until 2027. With traffic expected to worsen before it gets better, there is some reprieve for those who drive electrified vehicles daily.
The MMDA and the DOTr confirmed that aside from cars driven by Transportation Network Vehicle Services (TNVS), the agency has announced that electric vehicles (EVs), hybrid electric vehicles (HEVs), and plug-in hybrids (PHEVs) are exempted from the upcoming odd-even scheme. That's right, those who have to take EDSA during the rehabilitation works need not worry about violating the new coding scheme.
Since the EVIDA law covers such vehicles as exempted from the Unified Vehicular Volume Reduction Program (UVVRP), AKA the number coding scheme, it's not surprising that EVs, PHEVs, and HEVs are also safe from the odd-even number scheme the MMDA will implement next month.
As a reminder, the odd-even number scheme will be based on the number ending of your license plate or conduction sticker, and will be as follows:
Plates or Conduction Sticker ending 1 / 3 / 5 / 7 / 9 – Banned on Monday, Wednesday, Friday
Plates or Conduction Sticker ending 2 / 4 / 6 / 8 / 0 – Banned on Tuesday, Thursday, Saturday
With heavier traffic set to take place starting June 13, 2025, we'll be curious just how the agencies will be able to manage traffic. After all, Metro Manila has one of the worst traffic situations in the world.;
Related Posts

EDSA Rebuild will see implementation of odd-even scheme
DPWH, MMDA, and DOTr share plans to manage EDSA traffic during major rebuild project

DOTr: Parts of Skyway 3 will be toll-free during EDSA rehab
DOTr confirms that parts of Skyway 3 will be toll-free in light of the upcoming EDSA rehab starting June 13, 2025

Gov't agencies finalizing alternate routes, protocols amid EDSA rehab
Alternate routes, such as using Skyway, are being considered by the DOTr, TRB

EDSA Rehab to begin on Christmas Eve, will be done in 8 months
Initial rehab works along EDSA will see the reblocking and asphalt overlaying on the EDSA Busway

Toyota's Koji Sato: Japanese brands need to work together to take on Chinese EVs
With Chinese brands continuing to disrupt auto markets, Toyota CIO Koji Sato believes Japanese brands need to standardize certain parts and collaborate more

EDSA rehabilitation project to officially begin on June 13, 2025
Motorists are advised to brace for heavier traffic along EDSA as rehab works will begin this June 2025